Supplier evaluation and order documentation
Review SourceTide’s four inspection stages (incoming, first-article, in-process and final) with a sample inspection record, the documents discussed for an order, and the management-system certification of our core manufacturing base.
Quality Stages for the Agreed Requirement
From raw material to packing, precision machined parts pass four inspection stages: incoming, first-article, in-process and final. Each stage is recorded with data from the manufacturing site and reviewed and issued by SourceTide; the final inspection record, material statement and production record ship with the goods.
Incoming
Material and blank confirmed
First article
Full first piece checked before batch
In-process
Scheduled checks during machining
Final
Sampling plan before shipment

01Incoming Inspection
On receipt, before machining
Material documents and heat number are checked against the order, appearance is inspected, and hardness and blank allowance are sampled. Non-conforming material is not released to production.
The incoming stage addresses material and specification information relevant to the order. The applicable requirements should be clear before they are used as a production basis.
Clarify for your order: the material designation, the drawing or specification revision and the information expected with the incoming requirement.
Records to discuss: applicable material documents and any incoming-stage information required by the agreed inspection scope. A document requirement should be stated explicitly rather than inferred from a general quality claim.

02First-Article Inspection
First piece of each batch, and after a tool or setup change
The first piece is measured item by item against the drawing; batch machining starts only after every item is confirmed.

03In-Process Inspection
During batch machining
Key dimensions are sampled at set intervals by operation; any drift is corrected early, and records stay with the batch.
The in-process stage addresses agreed inspection points during production. The relevant checks depend on the part and the requirements confirmed for the order.
Clarify for your order: critical dimensions, relevant drawing notes and any inspection points your engineering or purchasing team requires.
Records to discuss: the production-stage inspection information needed for the agreed scope. The required record format and any additional testing should be discussed before it is assumed to be included.

04Final Inspection
Before packing and shipment
Key dimensions, geometric tolerances and surface quality are checked to the sampling plan; the inspection record ships with the goods.
The final stage addresses the part and required records against the confirmed order requirements before delivery.
Clarify for your order: the applicable drawing revision, acceptance requirements, dimensional inspection information and material documentation expected for delivery.
Records to discuss: the agreed dimensional inspection report and relevant delivery documents. Special testing or third-party inspection is handled under a separately confirmed scope when required.
Sample Inspection Record: Flange SAMPLE-001
A generic sample flange shows what is checked at each stage and how it is recorded.
Incoming inspection record
Sample · illustrative data
Part: Flange (sample) · Drawing / Rev.: SAMPLE-001 / A · Material: EN-GJS-500-7 ductile iron · Batch: SMP-0001 · Lot size: 50 pcs
| No. | Characteristic | Requirement | Method | Measured | Result |
|---|---|---|---|---|---|
| 1 | Material document check | EN-GJS-500-7, heat no. matches documents | Document review | Matches | OK |
| 2 | Appearance | No cracks, shrinkage or inclusions | Visual | No defects | OK |
| 3 | Hardness | HB 170–230 | Brinell tester | 188 / 195 / 201 | OK |
| 4 | Blank OD | Φ426 ±1.5 | Caliper | 426.4 / 425.9 / 426.8 | OK |
| 5 | Blank thickness | 46 ±1.0 | Caliper | 46.3 / 45.8 / 46.5 | OK |
| 6 | Quantity | 50 pcs | Count | 50 | OK |
Conclusion: accepted. Inspected by QC-01 at the manufacturing site; reviewed and issued by SourceTide.
First-article inspection record
Sample · illustrative data
Part: Flange (sample) · Drawing / Rev.: SAMPLE-001 / A · Material: EN-GJS-500-7 ductile iron · Batch: SMP-0001 · Lot size: 50 pcs
| No. | Characteristic | Requirement | Method | Measured | Result |
|---|---|---|---|---|---|
| 1 | Outer diameter | Φ420 ±0.10 | CMM | 420.03 | OK |
| 2 | Bore | Φ200 H7 (+0.046/0) | Bore micrometer | 200.021 | OK |
| 3 | Spigot | Φ250 f7 (−0.050/−0.096) | OD micrometer | 249.932 | OK |
| 4 | Thickness | 40 ±0.05 | Micrometer | 40.02 | OK |
| 5 | Spigot height | 5 ±0.05 | Height gauge | 5.01 | OK |
| 6 | Bolt circle (PCD) | Φ360 ±0.10 | CMM | 360.04 | OK |
| 7 | Bolt holes | 8-Φ22 (+0.2/0) | Plug gauge | 22.08 | OK |
| 8 | Position | ⌖ Φ0.2 | CMM | 0.08 | OK |
| 9 | Face runout | ↗ 0.03 A | CMM | 0.015 | OK |
| 10 | Bore roughness | Ra 1.6 | Roughness tester | 1.2 | OK |
First article: 1 pc. Conclusion: accepted. Inspected by QC-01 at the manufacturing site; reviewed and issued by SourceTide.
In-process inspection record
Sample · illustrative data
Part: Flange (sample) · Drawing / Rev.: SAMPLE-001 / A · Material: EN-GJS-500-7 ductile iron · Batch: SMP-0001 · Lot size: 50 pcs
| Time | Operation | Characteristic | Measured | Result |
|---|---|---|---|---|
| 09:00 | Finish machining | Bore Φ200 H7 | 200.018 | OK |
| 11:00 | Finish machining | Bore Φ200 H7 | 200.024 | OK |
| 13:30 | Finish machining | Spigot Φ250 f7 | 249.931 | OK |
| 15:00 | Drilling | Bolt circle Φ360 ±0.10 | 360.05 | OK |
| 16:30 | Finish machining | Bore Φ200 H7 | 200.020 | OK |
Conclusion: accepted. Inspected by QC-01 at the manufacturing site; reviewed and issued by SourceTide.
Final inspection record
Sample · illustrative data
Part: Flange (sample) · Drawing / Rev.: SAMPLE-001 / A · Material: EN-GJS-500-7 ductile iron · Batch: SMP-0001 · Lot size: 50 pcs
| No. | Characteristic | Requirement | S1 | S2 | S3 | S4 | S5 | Result |
|---|---|---|---|---|---|---|---|---|
| 1 | Outer diameter | Φ420 ±0.10 | 420.03 | 420.05 | 419.98 | 420.02 | 420.04 | OK |
| 2 | Bore | Φ200 H7 (+0.046/0) | 200.021 | 200.018 | 200.026 | 200.015 | 200.023 | OK |
| 3 | Spigot | Φ250 f7 (−0.050/−0.096) | 249.932 | 249.928 | 249.937 | 249.925 | 249.930 | OK |
| 4 | Thickness | 40 ±0.05 | 40.02 | 40.01 | 40.03 | 39.99 | 40.02 | OK |
| 8 | Position | ⌖ Φ0.2 | 0.08 | 0.10 | 0.07 | 0.09 | 0.08 | OK |
| 9 | Face runout | ↗ 0.03 A | 0.015 | 0.018 | 0.012 | 0.020 | 0.016 | OK |
| 10 | Bore roughness | Ra 1.6 | 1.2 | 1.1 | 1.3 | 1.2 | 1.1 | OK |
| 11 | Appearance | No dents or burrs; rust protection applied | ✓ | ✓ | ✓ | ✓ | ✓ | OK |
Sampling: 5 pcs / lot of 50. Conclusion: accepted. Inspected by QC-01 at the manufacturing site; reviewed and issued by SourceTide.
This is a sample. Part, data and numbers are illustrative and do not correspond to any customer project. Actual inspection items, sampling plans and record formats follow the customer’s drawing and order; third-party inspection can be arranged per project. Photos are taken on the production floor, de-identified, for reference only.
Quality Documents and Order Support
Normal order support

Material documentation
- Role in the requirement
- Records the applicable material information agreed for the part.
- Commercial boundary
- Routine documents remain within normal order support where applicable.
Dimensional inspection report
- Role in the requirement
- Records the inspection information agreed against the drawing or specification.
- Commercial boundary
- The report and inspection scope are aligned with the order.
Necessary routine export documents
- Role in the requirement
- Supports the normal export and delivery process.
- Commercial boundary
- Part of normal order support within the agreed scope.
Special testing
- Role in the requirement
- Addresses an additional technical test requirement.
- Commercial boundary
- Reviewed and quoted separately when required.
Third-party inspection or factory audit
- Role in the requirement
- Addresses a buyer-requested external review.
- Commercial boundary
- Scope, timing and fees are confirmed separately.
Additional destination-specific requirements
- Role in the requirement
- Addresses documents or checks beyond routine order support.
- Commercial boundary
- Reviewed against the request and quoted separately.
Special testing, third-party inspection, factory audits and additional destination-specific requirements are reviewed and quoted separately.
Review the service scopeReviewed and quoted separately
Management-System Certification
ISO 9001, ISO 14001 and ISO 45001 management-system certification for our core manufacturing base, covering mechanical components. Renewal is in progress; copies are available on request.
Our products are manufactured at our affiliated production factory, with relevant certifications issued under the factory’s registered legal entity.
ISO certificates
(full-size scan, opens in a new tab)ISO 9001:2015 Quality Management System
(full-size scan, opens in a new tab)ISO 14001:2015 Environmental Management System
(full-size scan, opens in a new tab)ISO 45001:2018 Occupational Health and Safety Management System
Credit-rating certificates
(full-size scan, opens in a new tab)AAA Credit Standing Enterprise Certificate
(full-size scan, opens in a new tab)AAA Credit Grade and AAA Honest Supplier Certificates
(full-size scan, opens in a new tab)AAA Contract-Honouring and Quality-Honouring Enterprise Certificates
(full-size scan, opens in a new tab)AAA Integrity Demonstration and Quality Service Integrity Certificates
Quality and Certificate FAQs
Do all three management-system certificates cover manufacturing and sales?
Each certificate covers its own scope. The quality management certificate covers the processing and sales of mechanical components. The environmental management certificate covers sales of mechanical components and related environmental management activities. The occupational health and safety certificate covers the related activities in the processing and sales of mechanical components. Read each scope individually rather than combining them into one broader claim.
What quality documents can be discussed for an order?
Routine material documentation and dimensional inspection reports can be provided within the agreed order scope where applicable. State the required records, drawing revision and acceptance needs early. A particular test method, external certificate format or third-party report is not automatically included simply because a quality-control framework is described on the website.
Are special tests and third-party inspections included automatically?
They are reviewed and quoted when required. Special testing, third-party inspection, factory audits and additional destination-specific requirements are scoped for your order, while routine documentation and normal delivery support remain within the agreed order scope. Discuss the requirement early so it can be planned.
Does a management-system certificate replace product inspection?
Product inspection is agreed for each order. A management-system certificate concerns the certified organization and its stated activities, while the drawing, material, inspection requirements and relevant order documents define the evidence needed for the part. Certificate review and product acceptance are evaluated together.

Clarify the Evidence Needed for Your Requirement
Tell us the part or equipment requirement, the certificate or document you need to review, and any inspection, destination or timing requirements. Identify an existing order reference when relevant.
The request will be reviewed against the applicable manufacturing resource and agreed scope. Drawings and large attachments are sent by email after the initial inquiry.
Discuss inspection or documentation requirementsReview Materials & Drawing Requirements