Quality Control & Certificate Records

Home//Quality & Certificate Records

Supplier evaluation and order documentation

Review SourceTide’s four inspection stages (incoming, first-article, in-process and final) with a sample inspection record, the documents discussed for an order, and the management-system certification of our core manufacturing base.

Quality Stages for the Agreed Requirement

From raw material to packing, precision machined parts pass four inspection stages: incoming, first-article, in-process and final. Each stage is recorded with data from the manufacturing site and reviewed and issued by SourceTide; the final inspection record, material statement and production record ship with the goods.

  1. Incoming

    Material and blank confirmed

  2. First article

    Full first piece checked before batch

  3. In-process

    Scheduled checks during machining

  4. Final

    Sampling plan before shipment

  1. Inspection area beside a machining centre

    01Incoming Inspection

    On receipt, before machining

    Material documents and heat number are checked against the order, appearance is inspected, and hardness and blank allowance are sampled. Non-conforming material is not released to production.

    The incoming stage addresses material and specification information relevant to the order. The applicable requirements should be clear before they are used as a production basis.

    Clarify for your order: the material designation, the drawing or specification revision and the information expected with the incoming requirement.

    Records to discuss: applicable material documents and any incoming-stage information required by the agreed inspection scope. A document requirement should be stated explicitly rather than inferred from a general quality claim.

  2. First-article inspection of a machined gear on a coordinate measuring machine

    02First-Article Inspection

    First piece of each batch, and after a tool or setup change

    The first piece is measured item by item against the drawing; batch machining starts only after every item is confirmed.

  3. CNC machining in progress, with parts waiting for the next operation

    03In-Process Inspection

    During batch machining

    Key dimensions are sampled at set intervals by operation; any drift is corrected early, and records stay with the batch.

    The in-process stage addresses agreed inspection points during production. The relevant checks depend on the part and the requirements confirmed for the order.

    Clarify for your order: critical dimensions, relevant drawing notes and any inspection points your engineering or purchasing team requires.

    Records to discuss: the production-stage inspection information needed for the agreed scope. The required record format and any additional testing should be discussed before it is assumed to be included.

  4. Final inspection of a machined ring on a coordinate measuring machine

    04Final Inspection

    Before packing and shipment

    Key dimensions, geometric tolerances and surface quality are checked to the sampling plan; the inspection record ships with the goods.

    The final stage addresses the part and required records against the confirmed order requirements before delivery.

    Clarify for your order: the applicable drawing revision, acceptance requirements, dimensional inspection information and material documentation expected for delivery.

    Records to discuss: the agreed dimensional inspection report and relevant delivery documents. Special testing or third-party inspection is handled under a separately confirmed scope when required.

Sample Inspection Record: Flange SAMPLE-001

A generic sample flange shows what is checked at each stage and how it is recorded.

Drawing of the generic sample flange SAMPLE-001, section A-A, with balloons numbering the inspection items
Generic sample flange SAMPLE-001. Balloon numbers match the inspection items. Actual inspection follows the customer’s drawing. Open the drawing full size

Incoming inspection record

Sample · illustrative data

Part: Flange (sample) · Drawing / Rev.: SAMPLE-001 / A · Material: EN-GJS-500-7 ductile iron · Batch: SMP-0001 · Lot size: 50 pcs

Sample incoming inspection record for flange SAMPLE-001, with illustrative data.
No.CharacteristicRequirementMethodMeasuredResult
1Material document checkEN-GJS-500-7, heat no. matches documentsDocument reviewMatchesOK
2AppearanceNo cracks, shrinkage or inclusionsVisualNo defectsOK
3HardnessHB 170–230Brinell tester188 / 195 / 201OK
4Blank ODΦ426 ±1.5Caliper426.4 / 425.9 / 426.8OK
5Blank thickness46 ±1.0Caliper46.3 / 45.8 / 46.5OK
6Quantity50 pcsCount50OK

Conclusion: accepted. Inspected by QC-01 at the manufacturing site; reviewed and issued by SourceTide.

This is a sample. Part, data and numbers are illustrative and do not correspond to any customer project. Actual inspection items, sampling plans and record formats follow the customer’s drawing and order; third-party inspection can be arranged per project. Photos are taken on the production floor, de-identified, for reference only.

Quality Documents and Order Support

Normal order support

Double-flange stepped sleeve after machining

Material documentation

Role in the requirement
Records the applicable material information agreed for the part.
Commercial boundary
Routine documents remain within normal order support where applicable.

Special testing, third-party inspection, factory audits and additional destination-specific requirements are reviewed and quoted separately.

Review the service scope

Reviewed and quoted separately

Management-System Certification

ISO 9001, ISO 14001 and ISO 45001 management-system certification for our core manufacturing base, covering mechanical components. Renewal is in progress; copies are available on request.

Our products are manufactured at our affiliated production factory, with relevant certifications issued under the factory’s registered legal entity.

ISO certificates

Credit-rating certificates

Quality and Certificate FAQs

Do all three management-system certificates cover manufacturing and sales?

Each certificate covers its own scope. The quality management certificate covers the processing and sales of mechanical components. The environmental management certificate covers sales of mechanical components and related environmental management activities. The occupational health and safety certificate covers the related activities in the processing and sales of mechanical components. Read each scope individually rather than combining them into one broader claim.

What quality documents can be discussed for an order?

Routine material documentation and dimensional inspection reports can be provided within the agreed order scope where applicable. State the required records, drawing revision and acceptance needs early. A particular test method, external certificate format or third-party report is not automatically included simply because a quality-control framework is described on the website.

Are special tests and third-party inspections included automatically?

They are reviewed and quoted when required. Special testing, third-party inspection, factory audits and additional destination-specific requirements are scoped for your order, while routine documentation and normal delivery support remain within the agreed order scope. Discuss the requirement early so it can be planned.

Does a management-system certificate replace product inspection?

Product inspection is agreed for each order. A management-system certificate concerns the certified organization and its stated activities, while the drawing, material, inspection requirements and relevant order documents define the evidence needed for the part. Certificate review and product acceptance are evaluated together.

Rows of CNC machining centres with finished rings on pallets

Clarify the Evidence Needed for Your Requirement

Tell us the part or equipment requirement, the certificate or document you need to review, and any inspection, destination or timing requirements. Identify an existing order reference when relevant.

The request will be reviewed against the applicable manufacturing resource and agreed scope. Drawings and large attachments are sent by email after the initial inquiry.