Buyer guide for cross-border delivery
You have agreed the price and the part. If the documents have not been agreed, you are not done. What holds up an industrial shipment is usually settled, or left unsettled, at quoting stage, weeks before anything is packed.

Documents Commonly Travelling With Industrial Goods
Commercial invoice
What it is: States the goods, values and terms of the sale.
When it is usually asked for: Core set, usually required.
Packing list
What it is: What is in which package, with weights and dimensions.
When it is usually asked for: Core set, usually required.
Transport document
What it is: Bill of lading or air waybill, depending on the mode.
When it is usually asked for: Core set, usually required.
Inspection records
What it is: Measured values against the requirements on the drawing.
When it is usually asked for: Where quality teams or import procedures call for it. Basic inspection records are provided with the order.
Certificate of origin
What it is: Where the goods were produced.
When it is usually asked for: Depends on destination and on any preferential arrangements that apply.
Requirements differ by destination, by what the goods are, and by what you ask for. No list is complete for every case. Confirm with your customs broker early, and tell your supplier at quoting stage which documents you need and in what format, so they become part of how the order closes out.
What Comes With the Order, and What Is Chargeable
| Type | Detail |
|---|---|
| Provided with the order | Basic production records, basic inspection records and a basic material statement for the parts supplied. |
| Chargeable, quoted per project | Certificates of origin and export documents beyond the basic set; factory audit support; third-party inspection; special packaging and any additional testing. |
| Samples | Samples and sample runs are chargeable; the cost may be set against a subsequent batch order. |
Inspection and Factory Audit: Two Jobs, Two Windows
Factory audit
How a producer is set up: systems, process control, records.
When: before you commit. Asking once the goods exist answers a different question from the one you needed answered.
Third-party inspection
A specific batch against a specific requirement.
When: after production, before shipment. There is a window; miss it and the options narrow considerably.
Trade Terms and Packaging
| Item | In outline |
|---|---|
| FOB | Seller delivers on board the vessel at the named port of shipment. Each term moves the point at which cost and risk transfer: who arranges transport and insurance, who handles export and import formalities, and whose problem a delay is. Agreed early, it shapes packaging and documents; agreed late, it changes them. |
| Packaging | Neutral packaging carries no supplier marks, which is common where goods are resold or the buyer applies their own identification. Custom packaging follows the buyer’s specification: marking, labelling, crate construction, moisture protection for long sea legs. Blocking inside the crate and photographs at each stage before the doors close are worth asking for. |
Outline only. The applicable rules and the precise allocation of cost and risk are as set out in the contract and the Incoterms version it references.
What Gets Settled When
At enquiry
Destination, trade terms and the documents needed.
At quotation
Inspection and audit placed in the schedule.
At contract
Scope and terms confirmed.
Before production
Any audit arranged.
After production
Inspection within the window.
At shipment
Documents issued as agreed.
Agree the Documents at Quoting Stage
Tell us the destination, the trade term and the documents you need in your first inquiry, so they are part of the quotation.
Inspection, compliance documents and related services are quoted and confirmed separately per project. This guide is general information, not advice on your import procedures, and does not constitute a compliance determination for any shipment.